Planning and Scheduling

146. Can you drag and drop work orders and/or available resources on a graphical schedule, including
a. Observation of the affects on planned workload vs capacity as well as resultant availability? Yes, comprehensive within the CMMS
Some graphical scheduling capability
within the CMMS
Some graphical scheduling capability
using 3rd party software
No graphical scheduling capability
Rank the importance of this attribute:
b. Observation of individual work orders that make up a block of scheduled work? Comprehensive within the CMMS (e.g.,
using zoom or 'bubble' help when cursor
hovers over a day's work)
Some (e.g., in another window or using
drill around)
Some, using 3rd party software
No
N/A (i.e., no graphical scheduling capability
Rank the importance of this attribute:
c. Drag and drop capability for individual work orders on the graphical screen? Comprehensive within the CMMS (e.g.,
without leaving main graphical schedule
screen)
Some (e.g., in another window
or navigating to a screen with greater detail)
No
No graphical scheduling capability
N/A (i.e., no graphical scheduling capability
Rank the importance of this attribute:
147. Can the schedule display in-process work orders, including revised hours by craft to completion or % completion?
Yes
Yes, but through 3rd party software
Yes, some
No
Rank the importance of this attribute:
148. Does the schedule display shutdowns, peak production periods, holidays?
Yes, all of the above
Yes, some
No
Rank the importance of this attribute:
149. Does the schedule display % allocation, ie, the % a given tradesperson is allocated for a user-specified period of time?
Yes
Yes, with configuration
Yes, with 3rd party integration
No
Rank the importance of this attribute:
150. Can you auto-assign labourers to work orders at any level on the equipment tree hierarchy (eg, John Smith will always do the electrical work on line #3 which includes 3 levels of assets/components)?
Yes
Configurable
3rd party
No
Rank the importance of this attribute:
151. Is there an interface between production scheduling and maintenance scheduling?
Comprehensive (i.e., online real-time interface, maintenance schedule available to production planning for consideration when planning production and vice versa; maintenance planning consumes production capacity during capacity planning and production scheduling)
Somewhat comprehensive (i.e., some of the above functionality available)
Configurable (i.e., have built an interface to some 3rd party ERP or production scheduling packages)
Customizable (i.e., could build a custom interface to 3rd party ERP or production scheduling packages)
No
Rank the importance of this attribute:
152. Can you drill-down to access work order information from within the schedule chart/graph?
Yes, including work order edit capability while scheduling
Yes, but work order information is display only
No, not from within scheduling
Rank the importance of this attribute:
153. Can you perform 'what-if' analysis on the schedule (i.e., go into simulation mode with an opportunity to accept or reject results of the simulation)?
a. Allowing changes to work order priority Yes, from within CMMS Yes, using 3rd party software No
Rank the importance of this attribute:
b. Allowing changes to estimated duration Yes, from within CMMS Yes, using 3rd party software No
Rank the importance of this attribute:
c. Allowing changes to labor availability Yes, from within CMMS Yes, using 3rd party software No
Rank the importance of this attribute:
d. Allowing changes to risk score due to aging factors (eg. equipment run longer, at high speed, with greater # of starts/stops or at a higher temperature than normal) Yes, from within CMMS Yes, using 3rd party software No
Rank the importance of this attribute:
154. Is there a zoom feature on the graphical schedule that allows users to easily zoom in and out (eg, show for 1 month, then 1 week, then 1 day, then 2-hour intervals, such that as user zooms in, more detail is available on specific work orders that comprise the interval displayed)?
Yes, comprehensive
Some
Configurable
3rd party
No
Rank the importance of this attribute:
155. Does the user have critical path analysis capability from within the CMMS?
Yes, comprehensive (eg, can change precedent relationships and dependencies in a table or right on the graphical schedule; can change lead and lag times between tasks; can flag a task as interruptible or not; can press a button to optionally optimize the critical path once changes are made to the schedule; system will highlight when edits or critical path optimization extends tasks outside promised date)
Some
Configurable
3rd party
No
Rank the importance of this attribute:
156. Can the user optionally see a graphical display of actual completed tasks as well as scheduled tasks?
Yes, comprehensive (eg, can show actual completed tasks and scheduled tasks on same graphical display; can show report and graphical display of schedule compliance; colour coding of actual vs scheduled PM compliance on table and graphical displays; display using colours when scheduled dates have been changed or tasks are running behind and by how much)
Some
Configurable
3rd party
No
Rank the importance of this attribute:
157. Are there special features that are built into the CMMS that assist users to manage a planned outage/shutdown/turnaround or large capital project(s)?
Yes, comprehensive (eg, work package management tied to the work order system; parts forecasting override to avoid distortion for shutdowns; sophisticated project / shutdown estimating, budgeting, actual cost control and variance tracking for labour, materials and contracted labour/materials; sophisticated project risk analysis; comprehensive resource estimating and tracking of variances to actual usage, for individual projects and across all projects; templates for creating project work breakdown structure and job plans quickly and easily including estimating, equipment breakdown, and cost breakdown; ability to change templates based on variance analysis; sub-contractor management for work done by external parties; critical path management in project management, both within the CMMS and/or using external project management software packages such as Primavera or MS Project; project performance tracking at any level in the work breakdown structure and for any time period in the project
Most (greater than 50% of functionality above)
Some
Configurable
3rd party
No
Rank the importance of this attribute:
158. Can the CMMS create forecasts based on historical averages for meter readings?
Yes
Configurable
3rd party
No
Rank the importance of this attribute:
159. Can resources such as tools, cranes, or special equipment be:?
a. Scheduled separately (e.g., to avoid double booking)? Comprehensive (i.e., separate module/function)
Some (i.e., using an equivalent work-around)
None
Rank the importance of this attribute:
b. Analyzed (e.g., utilization)? Comprehensive (i.e., separate module/function,
standard analysis reports)
Some (i.e., using an equivalent work-around,
configuration, custom report)
None
Rank the importance of this attribute:
c. Costed (e.g., using allocation by resource type)? Comprehensive (i.e., separate module/function,
standard analysis reports)
Some (i.e., using an equivalent work-around,
configuration, custom report)
None
Rank the importance of this attribute:
160. Can a user query the CMMS as to when specific labour and other resources (eg, a forklift) are next available to accomplish a given work order, and the system provides available time slots?
Yes, as a simple query from within the scheduling module including integration with the schedule
Configurable
Yes, but through the reporting function
No
Rank the importance of this attribute:
161. Are project management programs, such as PERT, available directly through the software to schedule projects, preventive maintenance, and planned maintenance?
Yes, built into the CMMS and through interface with several 3rd party project management programs
Yes, but built into the CMMS only
Yes, but through interface with several 3rd party project management programs
Yes, but through interface with one 3rd party project management program
No
Rank the importance of this attribute:
162. Can the user perform capacity planning, network optimization and workforce optimization (e.g., asset rationalization in any manufacturing and distribution supply chain, bandwidth capacity planning in the telecom industry, optimizing asset requirements for a new mine ramp-up, real-time updating of field-based maintainer’s optimal routing and schedule)?
Comprehensive (i.e., all three functions above using advanced tools such as linear programming, simulation, and heuristics)
Most (2 of the 3 functions above using advanced tools)
Some (1 of the 3 functions above using advanced tools)
Configurable
3rd party
No
Rank the importance of this attribute:
163. Do you have features and functions specific to capital asset planning?
Yes, separate comprehensive module available that includes multi-year long-term capital asset planning and budgeting, asset portfolio condition assessment, multi-year capital project planning, asset renewal cost forecasting models, what-if analysis for restoring and maintaining a targeted level of asset condition, etc.
Yes, some of the capital asset planning features above
No, not an area of specialization for our CMMS
Rank the importance of this attribute:
You have allocated a total of 0% of your total scoring allowance.
Input the percentage you wish to weight this section for your final product comparison. A weight of 0% will indicate that this section is not to be scored.

Scoring weight: % (Minimum 0%, maximum 100%)