CMMS/EAM Review
Planning and Scheduling Planning and Scheduling

Priorities

140. Specify the number of priority fields of EACH type below (do not double count fields).
a. Time-based or Urgency 10 or more 1-9 0
Rank the importance of this attribute:
b. Asset/Equipment criticality 10 or more 1-9 0
Rank the importance of this attribute:
c. Parts criticality 10 or more 1-9 0
Rank the importance of this attribute:
d. Health and safety 10 or more 1-9 0
Rank the importance of this attribute:
141. Other (please specify)
Rank the importance of this attribute:
142. User-defined (please specify)
Rank the importance of this attribute:
143. Can the user develop a sophisticated scoring system for ranking the criticality of assets, as well as define relative risk?
Comprehensive (i.e., can set up multiple user-definable questions for progressively scoring the severity of failure of an asset in terms of safety, environmental impact, quality, performance, etc; criteria, severities and scoring algorithms are user-definable; use of user-definable Boolean logic to determine final equipment criticality based on impact severities; calculation of probability of failure and relative risk; can schedule or filter alarms based on asset criticality ranking or relative risk)
Some
Simple (i.e., single, table-driven field for asset criticality)
Rank the importance of this attribute:
144. Are priorities combined and used in scheduling (e.g., multiply priorities together)?
Yes, comprehensive (i.e., users can build a priority ranking by weighting factors such as asset criticality, time-based priority, etc., as well as non-priority fields such as location and cost centre; user-defined algorithm for use in determining a scheduling priority)
Yes, simple multiplication of priorities
No
Rank the importance of this attribute:
145. Will the priority automatically increase if work is not completed on schedule, according to a user-defined algorithm (e.g., priority increases by one for each week that weekly PM's are past due)?
Yes
Yes, but not a user-defined algorithm
No
Rank the importance of this attribute:
You have allocated a total of 0% of your total scoring allowance.
Input the percentage you wish to weight this section for your final product comparison. A weight of 0% will indicate that this section is not to be scored.

Scoring weight: % (Minimum 0%, maximum 100%)